Capital and digital infrastructure, matched

We connect capital to digital infrastructure.

GM Data Centers AG matches retail, professional and institutional investors to the right data center, at the right stage. We do not pick sites from a spreadsheet. We have operated our own for four years, which is why we know which ones to put in front of capital.

Entity
GM Data Centers AG
Based in
Zug, Switzerland
Heritage
Green Mining, since 2022
The opportunity

Data centers are the infrastructure of the digital economy.

AI inference, HPC and digital infrastructure all hit the same wall: secured power. Demand is not the constraint. Capital reaching the right sites is. Closing that gap is what the platform exists to do.

$1.7T+

Global data center capital expenditure gap by 2030

McKinsey, The Cost of Compute, 2024

26%

Annual growth in global compute demand to 2030

McKinsey, AI compute outlook, 2025

$510B

Sub scale and specialized capacity that needs financing by 2030, with few channels to reach it

Derived from McKinsey data center demand outlook, 2024 to 2025

The platform

One platform. Three stages. Matched to every investor profile.

One place where capital meets vetted sites. The platform pairs each investor with a data center opportunity at the right stage of development, from early greenfield sites through to live, cash generating operations.

Greenfield

Early stage

Pre development sites with the longest horizon, for investors seeking the most involvement at the formative stage. The earliest stage carries the most risk, including the total loss of capital.

Fractional ownership via Swiss SPV structure (in preparation)

Mid stage

Under construction

Sites in build and commissioning, at development stage economics with construction and commissioning still to complete. Carries risk including the total loss of capital.

Tokenised Swiss Wertrechte via Swiss SPV structure (in preparation)

Operating

Live sites

Data centers already built and generating cash. Like every stage on the platform, it carries risk including the total loss of capital.

Tokenised Swiss Wertrechte, offered in Germany under a Wertpapier-Informationsblatt (section 4 WpPG)

Track record

Built, operated and financed, end to end.

Four years under the Green Mining brand proved the full value chain. We develop and construct the sites and their energy, we operate them at 99.6 percent uptime since December 2024, and we raise and match the capital. That is what lets us underwrite what goes on the platform.

7.5MW

Capacity developed end to end, including land, energy and construction

16MW

Capacity under contract

355+

MW total development pipeline, as at August 2026

99.6%

Uptime running GM3 since December 2024

CHF 10M+

Capital raised to date

350+

Investors matched across 14 countries

How it works

A closed loop, from screening to compounding.

The platform learns the investor. The investor compounds with the platform. AI assisted matching, structured vehicles and on chain transparency, end to end. Capabilities are rolling out in stages.

  1. 01

    Onboard

    Sign up and complete KYC.

  2. 02

    Screen

    An AI agent learns your risk profile and priorities.

  3. 03

    Match

    Personalised opportunities across all three stages.

  4. 04

    Allocate

    Fractional participation through structured vehicles.

  5. 05

    Track

    Live dashboards with on chain auditable reporting.

  6. 06

    Compound

    Reinvest and grow with the platform over time.

Why us

Three structural moats, built over four years.

From distribution to operator grade selection to platform wide optimisation: three layers of advantage that compound, and that a finance led platform cannot easily replicate.

01

Distribute

Build and license the product

We design and run the investor product ourselves, with distribution prepared under the German WIB regime and EU equivalents (in preparation).

02

Select

Underwrite like operators

Four years operating our own sites tells us what to back and what to walk away from: power, permitting, build cost, uptime, true economics.

03

Optimise

Our IP runs every site

Our operations stack and heat reuse lift performance at each site: lower power cost, higher uptime. Heat reuse: EU patent application filed (pending at the EPO).

Business model

How the platform earns.

Two engines feed the holding company: the assets we own and operate, and the platform that matches capital to them. Each layer builds on the one before it.

01

Site operating income

Hosting, compute and power margin at the sites we own and run.

02

Equity participation

We retain equity in the project vehicles we develop, so we hold a stake that scales as capacity grows.

03

Platform revenue

Curation fees and operations software, earned from third party operators who run on our stack.

04

Add-on layers

Heat reuse, software and IP licensing layered onto each site.

This is a marketing communication describing the business model in general terms. It is not an offer or a forecast of returns. The mix and economics vary by project and may change.

Green Mining heritage

The full value chain, proven in the field.

GM1Concept stage, no land, no energy contractProof of model
GM2Land secured, with proven operational expertiseProof of execution
GM3Vision, land and energy, operationalLive, 7.5 MW Paraguay, 99.6% uptime
GM4New jurisdiction and new energy mix, ZambiaIn build, construction from Q4 2026
Contact

Let's talk about the infrastructure of the digital economy.

For partnership, co investment and platform enquiries, reach the team at GM Data Centers AG in Zug, Switzerland.

Speak to the team

Helpful to include: your name, your organisation, and the one or two things you want to know. No financial details are needed at this stage.